This posting has been archived
Umoja and Leonardo Da Vinci Gym Upgrades and EV Chargers , Sacramento, CA
- Owner Reference
- 0151-470, 0450-470
- Bid Date
- May 13, 2026 at 02:00pm
- Pre-Bid
- MANDATORY - 5/4/2026 @ 10:00am @ (for location please or )
- Owner
- Sacramento City Unified School District
- Trades
- C21 - Demolition Contractor, Building Removal and/or Relocation, Wrecking & Hauling, Interior/Exterior Sports Athletic Facilities: Sports Courts, Paving, Concrete or Wood Flooring: Basketball, Racquetball, Tennis, Electric Vehicle Charging Stations (EVCS) & (EV) Supply Equipment; Battery Electric Bus (BEB) & Zero Emission Vessels (ZEV)
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The Scope of Work includes the complete demolition and replacement of the existing gymnasium 14 floor system, bleacher system, basketball hoops, wall padding, and court striping. The project also includes the 15 installation of two (2) electric vehicle (EV) charging units, each equipped with dual chargers, for a total of four (4) 16 charging ports, along with all related and associated work necessary for a complete and functional installation.
Bonds required. Prevailing wages.
Contact
- Tina Alvarez-Bevens
- [email protected]
CBS ID: 821871 | Published 5/1/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.