Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#609439 Posted 11/30/2021

Street Rehabilitation FY 2022, Berkeley, CA

Owner Reference
22-11470-C
Bid Date
Jan 6, 2022 at 02:00pm
Estimate
$5.07 million
Owner
City of Berkeley CA
Trades
General Engineering Contractor GEC

Description

Street Rehabilitation Work includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, valley gutters, drainage, crack sealing, base failure repairs, ARAM cape seal, cold planing, removal and disposal of pavement surfaces and base materials, stabilization, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, pavement markings, striping, markers, signage, and traffic loops as specified. See attached fotr specifics related to this and the intersection reconfiguartion at Dwight Way & California Street component of this project. 

Bonds required. Prevailing wages.

Contact

CBS ID: 609439 | Published 11/30/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.