#610070 Posted 12/6/2021

2nd BID DATE CHANGE - Millbrae Tail Tracks Extension, Millbrae CA

Owner Reference
BARTD-15CH-110
Bid Date
Feb 1, 2022 at 02:00pm
Pre-Bid
Recommended - 12/14/2021 @ 01:30PM @ (for location please or )
Estimate
$8.5 M - $9.5 Million
Owner
San Francisco Bay Area Rapid Transit District CA
Trades
A - General Engineering Contractor GEC

Description

The prime scope of the Project is to upgrade existing W1, W2 and W4 tail tracks by about 309 feet each from end of line beyond BART Millbrae Station, to allow BART to store an additional 3 rail cars on each track to make 10-car trains available for ease of service start up at Millbrae Station that currently have a 7-car train storage capacity. The improvements are very essential to increase system wide operational capacity as the BART Warm Spring (WSX) and the San Jose (SVBX) Extension projects are coming online. Accordingly, the Project will relocate Friction Bumpers, and extend traction power and train control, lighting, asphalt concrete and cement concrete cart path, retaining walls, and high security fencing. The new tail tracks would be located on an enclosed swath of land owned by BART.  Please refer to Technical Specifications Section 01 11 00 Summary of Work for more information.  DBE participation goal is 25%.

Bonds required. Prevailing wages.

Contact

CBS ID: 610070 | Published 12/6/2021 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.