Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#632725 Posted 6/23/2022

Alves Lane Trail Crossing Improvements Project, Bay Point CA

Owner Reference
0662-6R4116
Bid Date
Jul 26, 2022 at 02:00pm
Pre-Bid
Recommended - 7/11/2022 @ 10:00am @ (for location please or )
Estimate
$198,000
Owner
County of Contra Costa CA
Trades
A - General Engineering Contractor GEC, C8 - Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47, C10 - Electrical Contractor - Including Lighting and Possible High Voltage

Description

The work to be done generally consists of installing sidewalk, curb ramps, solar-powered rectangular rapid flashing beacon (RRFB) system, and pedestrian push-buttons, a raised crosswalk across Alves Lane, and striping and pavement markings at the Delta de Anza crossing in the Bay Point area. 20 working days. DBE/MBE/WBE GFE required.

Bonds required. Prevailing wages.

Contact

CBS ID: 632725 | Published 6/23/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.