Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#694821 Posted 1/23/2024

Lincoln Elementary School Safe Route Improvements, Richmond, CA

Owner Reference
OBAG 2
Bid Date
Feb 20, 2024 at 08:00am
Questions Due By
02/09/2024 5:00 PM (PST)
Pre-Bid
Scheduled - 1/26/2024 @ 09:00am @ (for location please or )
Owner
City of Richmond CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities, C8 - Concrete Contractor: CIP Concrete, Pedestrian Improvements, Sidewalks, Curbs Gutters, Driveways & Handicap ADA Ramps NIGP 913-47
Phase
Renovation, Remodel, Improvements, Upgrades

Description

In general, the work consists of clearing and grubbing, installation of temporary traffic control measures, disposal of material, removal of asphalt concrete, construction of raised intersection, construction of raised concrete median, installation of detectable warning surface, adjust sanitary sewer cleanout cover to grade, adjust sanitary sewer manhole cover to grade, adjust storm drain manhole cover to grade, adjust water valve cover to grade, install pre-formed thermoplastic crosswalk marking, install 12” thermoplastic pavement marking or crosswalk, paint curb red, installation of 4” diagonal stripe (white), and install new sign and post; and for all other work, items, or details including demolition and removals, that are required by the Drawings, State Standard Specifications, of these Special Provisions. Bid Additive work includes construction of construction of raised crosswalk, adjust storm drain manhole cover to grade, installation of pre-formed thermoplastic crosswalk marking, installation of solar rectangular rapid flashing beacon, installation of thermoplastic pavement marking, and installation of 12” thermoplastic pavement marking or crosswalk; and for all other work, items, or details including demolition and removals, that are required by the Drawings, State Standard Specifications, of these Special Provisions. MBE/WBE Goals at 6%.

Bonds required. Prevailing wages.

Contact

CBS ID: 694821 | Published 1/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.