Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#699425 Posted 3/5/2024

Willow Pass Repaving Safe Route to Transit (SR2T), Concord, CA

Owner Reference
2449
Bid Date
Mar 28, 2024 at 02:00pm
Questions Due By
5:00 PM on March 20, 2024
Estimate
$8.5 million (including Bid Additive A and B)
Owner
City of Concord CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades

Description

General Description: The work to be done in general consists of mobilization, traffic control, storm water pollution control, street pavement rehabilitation, pavement milling, cold-in-place recycling, placement of conventional and rubberized hot mix asphalt concrete, ADA ramp construction, traffic striping and markings, installation of High Intensity Activated Traffic Crosswalk (HAWK) Signal and Solar Powered Rectangular Rapid Flashing Beacon (RRFB) and all other work as shown on the Plans and as specified in these Special Provisions.

Bonds required. Prevailing wages.

Contact

CBS ID: 699425 | Published 3/5/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.