Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#723938 Posted 9/25/2024

Pleasant Hill Road Bridge Over Taylor Blvd. Preventative Maintenance Project, Contra Costa CA

Owner Reference
0662-6R4086
Bid Date
Oct 22, 2024 at 02:00pm
Pre-Bid
Recommended - 10/7/2024 @ 10:00am @ (for location please or )
Estimate
$1,218,000
Owner
County of Contra Costa CA
Trades
C32 - Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310, Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
60 working days

Description

The project generally consists of preventative maintenance on the Pleasant Hill Road Bridge over Taylor Boulevard. Work to be done includes but is not limited to placing a polyester concrete overlay on the bridge deck, adding limited slope paving under the bridge, patching spalls on the bridge girders, patching spalls on various bridge substructure locations, replacing approach guardrails, pavement replacement, slurry sealing, and approach roadway striping. DBE Goal: 20%

Bonds required. Prevailing wages.

Contact

CBS ID: 723938 | Published 9/25/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.