This posting has been archived
Morgan Territory Road Post Mile 5.0 Bridge Replacement, Clayton CA
- Owner Reference
- 0662-6U4160
- Bid Date
- Mar 17, 2026 at 02:00pm
- Pre-Bid
- Scheduled, Optional - 3/2/2026 @ 10:00am @ (for location please or )
- Estimate
- $2,475,000
- Owner
- County of Contra Costa CA
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, Highway, Roadways, Bridge, Railroad, Airport Construction, Maintenance & Repair: Horizontal Construction, Stone Masonry Contractor: Block Wall, Chimneys, Retaining Walls
- Phase
- Renovation, Remodel, Improvements, Upgrades
- Duration
- 110 working days
Description
The work to be done generally consists of replacing a timber bridge with a reinforced concrete bridge with concrete pile foundations and two soldier pile retaining walls. Work includes constructing temporary stream diversion system, detour road, rock slope protection, drainage systems, guard railing, grading and paving. Construction will occur over one season
Contact
- Robert Ferguson
- [email protected]
CBS ID: 809895 | Published 2/17/2026 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.