#614738 Posted 1/18/2022

Mosquito Rd at South Fork American River Bridge Replacement Project, Placerville CA

Owner Reference
Quest Project #7267650 - 36105028 (77126)
Bid Date
Feb 11, 2022 at 02:00pm
Pre-Bid
Mandatory - 1/19/2022 @ 02:00PM @ (for location please or )
Estimate
$56,000,000
Owner
County of El Dorado CA
Trades
A - General Engineering Contractor GEC

Description

This is a 580 working day Project. Construction consists of a cast-in-place pre-stressed concrete segmental box girder bridge over South Fork American River; construction of soil nail, tie-back, soldier pile, and reinforced concrete retaining walls; construction of cast-in-drilled-hole (CIDH) concrete piles and optional micropiles; and grading, paving, and drainage system improvements for the re-aligned roadway. Performance, construction or installation of other items or details not mentioned above, that are in the Plans, Standard Plans, Standard Specifications, or these Special Provisions. Bidding for this Project consists of a Base Bid (Schedule A) with all Pier 2 Alternative Bids (Schedule B through D) and Pier 3 Alternative Bids (Schedule E through H) in accordance with the Proposal, Special Provisions, and Agreement. All bids will be compared by the summation of Proposal Pay Items and Bid Price Schedule for the Base Bid (Schedule A), lowest schedule bid for Pier 2 (Schedules B, C, or D), and lowest schedule bid for Pier 3 (Schedules E, F, or G).


Additional Description: BASE BID (SCHEDULE A): Consists of constructing bridge pile caps, abutments, piers, superstructure, approach slabs, and barrier rails; bridge abutment return walls and Type 1A retaining walls; pier soldier pile, tie-back, and soil-nail retaining walls; roadway approach sections, Type 1 & 1A retaining walls, culvert, drainage structures, and Midwest Guardrail Systems (MGS); all associated excavation, structure backfill, embankment fill, and rock slope protection. PIER 2 ALTERNATIVE BIDS (SCHEDULES B – D): Consists of construction and installation of CIDH piles. All Pier 2 alternatives (Schedules B – D) consisting of 36”, 48”, and 60” CIDH must be bid. After bid opening, the lowest cost Pier 2 alternative schedule will be the Contract Pier 2 Alternative Bid Schedule for construction. PIER 3 ALTERNATIVE BIDS (SCHEUDLES E – H): Consists of construction and installation of CIDH piles or micro-piles. All Pier 3 alternatives (Schedules E – H) consisting of 36”, 48”, and 60” CIDH, and 10” micropile alternative schedules must be bid. After bid opening, the lowest cost Pier 3 alternative schedule will be the Contract Pier 3 Alternative Bid Schedule for construction.  Project Completion date to be 11/1/2024.

Bonds required. Prevailing wages.

Contact

CBS ID: 614738 | Published 1/18/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.