Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#622988 Posted 3/26/2022

Langford Ave Sidewalk & Paving Project, Arvin, CA

Owner Reference
2201
Bid Date
Apr 27, 2022 at 04:00pm
Pre-Bid
Scheduled - 4/13/2022 @ 02:00PM @ (for location please or )
Estimate
$180,000
Owner
City of Arvin CA
Trades
A - General Engineering Contractor GEC

Description

The work consists of the construction of approximately 1,333 LF of standard sidewalk, curb and gutter along Langford Avenue and South A Street per City standards, crosswalk striping, including paving the extent from the new gutter to a minimum of 1 foot into the existing edge of pavement. General improvements will include clearing, construction of curb, gutter, sidewalk, ADA compliant curb ramp, crosswalk striping, and paving of the roadway between the new gutter and a minimum of 1 foot into the existing edge of pavement. Project duration is 30 days. Questions are due no later than 1:00 PM on April 15th. DBE Goal: 5%

Bonds required. Prevailing wages.

Contact

CBS ID: 622988 | Published 3/26/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.