Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#635505 Posted 7/26/2022

Bid date change - Pinon Pines Fluoride Mitigation Project, Frazier Park CA

Bid Date
Sep 22, 2022 at 03:00PM
Pre-Bid
Recommended - 8/11/2022 @ 10:00am @ (for location please or )
Estimate
$2M - $2.25 Million
Owner
Pinon Pines Estates Mutual Water Company (PPEMWC) CA
Trades
A - General Engineering Contractor GEC, C57 - Water Well Construction: Drilling, Installation, Improvements & Maintenance - General Engineering Contractor

Description

Construction of a 480ft deep production well and pump using rotary drilling method; demolition of two tanks and construction of a 212,000-gallon bolted steel water tank, construction of a 22,000-gallon welded steel tank, booster pump station, grading, paving, metal building, electrical, pipeline work and revegetation. 270 calendar days. Deadline for questions is 8/16/22. Bidder shall perform a Good Faith Effort to ensure that Disadvantaged Business Enterprises (DBE) have the opportunity to compete.

Bonds required. Prevailing wages.

Contact

  • (661) 245-4420

CBS ID: 635505 | Published 7/26/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.