Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#711888 Posted 6/24/2024

Camp Condor Water System Improvements, Westside Mountain Park CA

Owner Reference
1966.8113.21
Bid Date
Jul 23, 2024 at 11:00am
Questions Due By
7/12/24 by 5 pm
Pre-Bid
Mandatory - 7/2/2024 @ 01:00pm @ (for location please or )
Estimate
$1,562,500
Owner
County of Kern CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
127 days

Description

The project, in general, consists of all labor, materials, equipment, and other necessary items to provide water system improvements and upgrades that include, but are not limited to, a new 120,000 gallon bolted steel water tank, chlorination system in a protective shed/building, booster pump station, piping upgrades which include a fire water line and a distribution system, two water meters, new electrical switchgear to supply the well pump, booster pumps, chlorination system, and water meters.

Bonds required. Prevailing wages.

Contact

CBS ID: 711888 | Published 6/24/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.