Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#722568 Posted 9/17/2024

Camp Condor Water System Improvements, Pine Mountain Club CA

Owner Reference
1966.8113-21
Bid Date
Oct 8, 2024 at 11:00am
Questions Due By
9/27/24 by 5 pm
Pre-Bid
Recommended - 9/25/2024 @ 01:00pm @ (for location please or )
Owner
County of Kern CA
Trades
C57 - Water Well Construction & Waterworks: Drilling, Installation, Improvements & Repairs - General Engineering Contractor
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
120 working days

Description

In general, the project consists of, but is not limited to, installation of a submersible pump and wellhead piping at the existing well, a hydropneumatic tank in a weatherproof cabinet, chlorination system in a shed, installation of electrical power, water distribution piping, and a metered connection to the school

Bonds required. Prevailing wages.

Contact

CBS ID: 722568 | Published 9/17/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.