Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#652373 Posted 1/1/2023

Palos Verdes Recycled Water Pipeline Project, Palos Verdes CA

Owner Reference
T9302
Bid Date
Feb 6, 2023 at 10:00am
Pre-Bid
Mandatory - 1/4/2023 @ 00:70am @ (for location please or )
Owner
West Basin Municipal Water District (WBMWD) CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

Bids are being accepted by West Basin Municipal Water District (West Basin), a Municipal Water District, for the construction of the Palos Verdes Recycled Water Pipeline Project. Project Overview: • Approximately 3.5 Miles of pipe, 10” – 4” DIA • Cities of Torrance and Palos Verdes Estates • Residential / Commercial zone • 7 new recycled water sites (11 service lines ranging dia.: 2” to 4”) • Easements: • Private alley (Paseo Las Tortugas & Torrance Utility Road) • Lago Seco Park (parking lot) • Master Meter • Permits: Contractor to obtain all permits • PCH/Anza/Montana Avenue.• Small tree removal • Jack and bore at Anza Avenue (City of Torrance) • Directional Drilling at Torrance Utility Road • Coordination with Torrance with ongoing work in City • Contractor to coordinate with SCE and Palos Verdes Estates. DBE and Local Hire participation requirements.

Bonds required. Prevailing wages.

Contact

CBS ID: 652373 | Published 1/1/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.