Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#682713 Posted 9/8/2023

Turnbull Canyon Road Grade Separation Project, City of Industry, CA

Owner Reference
16-04, State #TCEP-P-1718-01
Bid Date
Oct 12, 2023 at 10:00am
Pre-Bid
Mandatory - 9/21/2023 @ 10:00am @ (for location please or )
Estimate
$61,000,000 - $65,000,000
Owner
San Gabriel Valley Council of Governments CA
Trades
Class A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

The project work includes, but is not limited to, The Project will construct a roadway overpass, elevating Turnbull Canyon Road over the railroad tracks and the intersections at Clark Avenue and Salt Lake Avenue (West), extending from Salt Lake Avenue (East) on the north to Marwood Street on the south. Turnbull Canyon Road consists of two lanes in each direction. The Project will elevate the inner lane in each direction over the tracks, while both outer lanes will no longer cross the tracks and remain at-grade to provide local access. The Project is proposing only partial acquisitions along Turnbull Canyon Road. In addition, temporary construction easements and permanent easements will be acquired. No relocations are required. Additional project details include: Retaining walls at each end of the overpass, Relocating utilities along Turnbull Canyon Road prior to overpass bridge construction, Relocating storm drain box culvert, pipes and laterals prior to overpass bridge construction, Maintaining local access and turnarounds under new bridge at Clark Avenue and Salt Lake Avenue (West), Enhanced truck access to local industrial parcels, Safe pedestrian/bike connectivity with a separate pedestrian bridge structure, and Replacement of landscaping. The Contractor shall begin work within 1 calendar days after the issuance of the Notice to Proceed date. This work shall be diligently prosecuted to completion before the expiration of 650 working days. Deadline for questions is September 28, 2023 by 5:00pm. SBE goal is 12%.

Bonds required. Prevailing wages.

Contact

CBS ID: 682713 | Published 9/8/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.