Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#690963 Posted 12/13/2023

Citywide Sidewalk Repair Project Phase II, Salinas, CA

Owner Reference
9720
Bid Date
Jan 16, 2024 at 02:00pm
Estimate
$2,662,339.44
Owner
City of Salinas CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities

Description

In general, work shall include but not limited to demolition of sidewalk, curb and gutter, driveway approaches, cross gutters, removal and disposal of existing trees and existing tree stumps; furnishing and installing new 15-gallon trees, plant establishment and maintenance period; repairing of sidewalk, curb and gutter, driveway approaches, cross gutters, grinding of sidewalk lips, construction of ADA pedestrian curb ramps; excavation, hauling and disposal of pavement, soil, and concrete; traffic control and erosion and sediment control plan as noted on the plans and all incidental and appurtenant improvements and restorations specified on the Plans and herein these Special Provisions. Project Duration: 95 Working Days. Questions are due 1/7/23 by 2pm.

Bonds required. Prevailing wages.

Contact

CBS ID: 690963 | Published 12/13/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.