Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#613163 Posted 1/3/2022

Napa Valley Vine Trail - St Helena to Calistoga, CA

Owner Reference
-Project No. 21-04 - Federal Project No. ATPL 6510(003)
Bid Date
Jan 31, 2022 at 02:00pm
Pre-Bid
Mandatory - 1/12/2022 @ 02:00PM @ (for location please or )
Estimate
$9,500,000
Owner
Napa Valley Transportation Authority
Trades
A - General Engineering Contractor GEC

Description

The work generally consists of the installation of a 7.4 milelong Class I bicycle and pedestrian path in the County of Napa from Pratt Avenue in St Helena to Fairway Drive Extension in the City of Calistoga. The majority of the path runs on the east side of State Route 29. This mixed-use facility consists primarily of a 10' wide asphalt concrete path with 2' shoulders, three bridges over Deconinck Wetland, Twomey Drainage and Napa River Crossing, installation of 2 new Pedestrian Hybrid Beacon (PHB) traffic signals, signage and striping, retaining walls, fencing, new drainage structure, biological mitigation, tree removal, landscaping and irrigation. Existing drainage features and patterns will remain along the extent of the project. The work must be completed within 240 working days. The site of the Work is located along the State Route 29 from Pratt Ave at St Helena to Lincoln Ave in Calistoga.

Bonds required. Prevailing wages.

Contact

CBS ID: 613163 | Published 1/3/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.