This posting has been archived
Browns Valley, Callison, Cooper ES Improvements Project, Vacaville CA
- Owner Reference
- 22-03 VUSD
- Bid Date
- Apr 5, 2022 at 02:00pm
- Pre-Bid
- Mandatory - 3/16/2022 @ 02:00pm @ (for location please or )
- Owner
- Vacaville Unified School District
- Trades
- B - General Contractor GC, A - General Engineering Contractor GEC, C4 - Boiler Hot Water Steam Fitting Installation Contractor and Controls, C7 - Electrical Contractor - Low Voltage, C10 - Electrical Contractor - Including Lighting and Possible High Voltage, C16 - Fire Alarm Protection & Suppression Contractor, C20 - Heating Ventilating Air Conditioning HVAC Contractor and Controls, C34 - Pipeline Contractor: Oil, Gas, Petroleum & Related Structures, C36 - Plumbing Contractor: may include Camera Inspections, C38 - Refrigeration Contractor, C42 - Sanitation System, Sewer Connection, Septic Tank Contractor, On Site Sewage Facility (OSSF); Tank Power Wash, Pressure Washing, C43 - Sheet Metal Contractor
Description
Work includes classroom technology improvements, accessibility improvements, roofing replacement and other work as specified. Type of work for which subcontractors must be prequalified is GC, GEC, A, B,C4, C7, C10, C16, C20, C34, C36, C38, C42, C43 and C46. Contact Patrick Neelan for further information.
Bonds required. Prevailing wages.
Contact
- Patrick Neelan
- (916) 779-5912
- [email protected]
CBS ID: 621273 | Published 3/10/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.