Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#663745 Posted 3/24/2023

*New Bid Date* Joiner Parkway Pavement Rehabilitation Phase 2, Lincoln CA

Owner Reference
CIP 298
Bid Date
Apr 27, 2023 at 01:30pm
Estimate
$1,663,600
Owner
City of Lincoln CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

The proposed project will rehabilitate the roadway by performing full-depth reclamation with cement (FDR‐C), correcting drainage issues by replacing some existing curb and gutter sections, upgrading all non-compliant ADA ramps across the area of Joiner Parkway, and replacing some minor concrete sidewalks. In addition, a pavement preservation treatment known as micro-surfacing will be placed from Moore Road to 108 Joiner Parkway (Joiner Pkwy Self Storage), and new traffic striping and pavement markings will be placed.

Bonds required. Prevailing wages.

Contact

CBS ID: 663745 | Published 3/24/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.