#806813 Posted 1/31/2026

Madden Creek Water System Improvement Project, Phase 4, Tahoe City, CA

Owner Reference
0048
Bid Date
Mar 16, 2026 at 02:00pm
Questions Due By
March 9, 2026 by 6:00pm
Pre-Bid
MANDATORY - 2/11/2026 @ 02:00pm @ (for location please or )
Estimate
$7,750,000
Owner
Tahoe City Public Utility District (TCPUD) CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The work to be performed for this project consists of all labor, material, tools, equipment, and incidentals necessary to construct approximately 7,725 total linear feet of water main installed via open cut (comprised of sizes 4, 6, 8, and 12 diameters of varying footages), approximately 450 +/- linear feet of 14 diameter water main installed via Horizontal Directional Drill (HDD) to accomplish a creek under crossing, mainline valves & fittings, mainline connections to existing, 15 fire hydrants, 78 water services & meter assemblies, service connections to existing customer side, air release valves, blowoff valves, surface restoration, and all associated items to complete the project in Placer County right-of-way or TCPUD easements as shown on the construction drawings.

Bonds required. Prevailing wages.

Contact

CBS ID: 806813 | Published 1/31/2026 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.