#689358 Posted 11/24/2023

*New Bid Date* Equipping New Well No. 172, Temecula, CA

Owner Reference
D2008
Bid Date
Feb 6, 2024 at 02:00pm
Pre-Bid
Encouraged - 12/5/2023 @ 09:00am @ (for location please or )
Estimate
$1,900,000
Owner
Rancho California Water District CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades

Description

The Work involves performing all work and furnishing all labor, materials, and equipment, as provided by the Contract Documents, for a completed Work of Improvement, as follows: Equipping New Well No. 172 [Project No. D2008]. Construction of Well No. 172 improvements, including installation of one (1) 100 HP vertical turbine pumping unit (pump intake set at a depth of 160 feet below ground surface) with electric motor; installation of approximately 960 lineal feet (LF) of well pump discharge piping, valves, and appurtenances; installation of and connection to existing below-grade well discharge piping at existing Well No. 153; installation of all associated electrical conduit, wiring, and appurtenances; installation of high-pressure relief and well blowoff piping, valves, and appurtenances; installation of well blowoff piping; installation of sodium hypochlorite feed piping and appurtenances; installation of concrete slab and below-grade piping for District furnished and installed pump water lubrication system panel and booster pump; and all related work. Construction of electrical improvements, including installation of District-furnished Motor Control Center (MCC); District-furnished electrical service transformer; installation of two (2) parallel direct bury cables (approximately 1,000 LF each) for 4160V electrical service; installation of two (2) splices to existing 4160V direct bury cable near Well No. 153; conduit, wiring, and appurtenances for well pumping unit; installation of one (1) light pole, fixture, concrete foundation and associated electrical conduit, wiring, and appurtenances; installation of conduit, wiring, and appurtenances for the sodium hypochlorite injection facility; installation of conduit and wiring for District-furnished and -installed pump water lubrication system panel and booster pump; and all related work, except as otherwise noted in the Special Construction Provisions, herein. Deadline for questions is January 16, 2024 by 4:00pm.

Bonds required. Prevailing wages.

Contact

CBS ID: 689358 | Published 11/24/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.