Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#665625 Posted 4/6/2023

Broadway Complete Streets, Sacramento, CA

Owner Reference
B23151131025
Bid Date
May 3, 2023 at 02:00pm
Pre-Bid
Scheduled - 4/12/2023 @ 09:00am @ (for location please or )
Estimate
$11,000,000
Owner
City of Sacramento CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities, C10 - Electrical Contractor - Lighting, LED, Luminaires, Utility, Transformers, High Voltage (HVE)

Description

The project includes two-way street conversion with buffered Class II bike lanes on Broadway, from 3rd Street to 19th Street, and 21st Street to 24th Street. The project also includes construction of a new roadway connection (29th Street), between X Street and Broadway. Work will include rehabilitation of roadway, reconstructing curb ramps to ADA standards, replacing curb, gutter and sidewalk, pavement markings, roadside signs, traffic signal modifications and street lighting as shown on the plans and as directed by the Engineer. Construction Time: 200 Working Days. Questions via Planetbids online Q&A due by 4/26/2023, 5:00pm. This is a federally funded project. DBE goal 22%.

Bonds required. Prevailing wages.

Contact

CBS ID: 665625 | Published 4/6/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.