Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#678841 Posted 8/1/2023

Bid date change - Harvest Water West Pipelines, Elk Grove, CA

Owner Reference
6025
Bid Date
Sep 19, 2023 at 01:00pm
Pre-Bid
Mandatory - 8/9/2023 @ 01:00pm @ (for location please or )
Estimate
$42,000,000
Owner
Sacramento Regional County Sanitation District (SacSewer) CA
Trades
Class A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

Construction of approximately 13.6 miles of a mixture of welded steel and HDPE pipelines in primarily rural Southern Sacramento County roads. Pipe diameters ranging from 48-inch to 14-inch. Also includes ten trenchless crossings using auger boring or pipe ramming techniques, numerous air valves, blowoffs and turnout connections. There are also several isolation valves.

Bonds required. Prevailing wages.

Contact

CBS ID: 678841 | Published 8/1/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.