Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#679879 Posted 8/10/2023

*Recalled* Pedestrian Crossing Upgrades at 4 Locations and Guardrail Replacement at 4 Locations, Elk Grove, CA

Owner Reference
WAM010 (Federal: HSIP5479(063)) and WTR059 (Federal: HSIP5479(062))
Bid Date
Sep 6, 2023 at 10:00am
Estimate
$713,800
Owner
City of Elk Grove CA
Trades
Class A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

The proposed Work shall be performed in accordance with the plans, specifications and other Contract Documents and shall include but not be limited to the following: The Pedestrian Crossing Upgrades at 4 Locations (WAM010) includes installation of curb ramps, crosswalks, advance yield signs, Rapid Rectangular Flashing Beacons (RRFB), and associated advanced warning signs. The Project is located at four (4) existing trail crossings; three (3) on Ryland Trail at Laguna Park Drive, Adobe Springs Way and Bertwin Way, and one (1) at Laguna Creek Trail and Stonebrook Drive. Guardrail Replacement is at 4 Locations (WTR059). The locations consist of: Bruceville Road at Laguna Creek Bridge, Sheldon Road at Laguna Creek Bridge, Waterman Road at Laguna Creek Bridge and Grant Line Road at Deer Creek Tributary Bridge (Work). Timeline is 50 working days. Question deadline is 08/28/2023 5:00 PM. DBE Participation Goal = 23.2%.

Bonds required. Prevailing wages.

Contact

CBS ID: 679879 | Published 8/10/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.