Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#701344 Posted 3/23/2024

Norwood Junior High School Exterior Paint Project, Sacramento, CA

Owner Reference
030524-7
Bid Date
Apr 4, 2024 at 11:00am
Questions Due By
March 22, 2024 by 2:00pm
Pre-Bid
Pre-Bid Meeting Has Passed - 3/20/2024 @ 10:30am @ (for location please or )
Estimate
$180,000
Owner
Twin Rivers Unified School District CA
Trades
Class B - *General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades

Description

Scope of Work: Prep and paint the entire exterior of Norwood Junior High School located at 4601 Norwood Ave, Sacramento, CA 95838. Provide and enforce usage of OSHA approved protective equipment (respirators, gloves, etc.). Contain work area by covering entire perimeter of structures, at least 10ft out, with 6mm plastic sheeting. Begin prep work by hand scraping loose and peeling paint. HEPA vacuum all debris collected on plastic sheeting and store in lead safe container. Pressure wash entire exterior of structure. Collect all water runoff by wet vacuuming plastic and storing liquids in lead safe containers. Apply full coat of primer to encapsulate any remaining, loose particles and properly prepare surfaces. Prep and painting of all surfaces to follow manufacturer's specifications. Remove and replace trim affected by dry rot in kind. Remove and replace failing stucco in kind. Hand sand to smooth, then caulk/patch any obvious cracks. Seal any gaps around windows & doors. Apply spot primer to all areas of repair per manufacturer’s specifications. Fill cracks in stucco prior to painting per manufacturer’s specifications. Finish- Stucco will be painted with Elastomeric paint per manufacturer's specifications. Paint all walls, trim, soffits, eaves, exterior doors (both sides inside and outside), ornamental iron and handrails per manufacturer’s specifications. Paint all previously painted surfaces including existing conduits and pipes. Prep, prime and then paint Aluminum siding on Building A East elevation per manufacturer’s specifications. Paint Scheme will include one body color, two trim colors, one accent color and one ornamental iron color to be selected by owner. DVBE goal is 3%.

Bonds required. Prevailing wages.

Contact

CBS ID: 701344 | Published 3/23/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.