Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#764184 Posted 6/5/2025

NEW BID DATE - Accelerated Drought Response Project (ADRoP) Aquifer Storage and Recovery Well Sites and Pipeline, Hollister, CA

Owner Reference
2025-001
Bid Date
Jul 25, 2025 at 02:00pm
Pre-Bid
MANDATORY - 6/18/2025 @ 01:00pm @ (for location please or )
Owner
County of San Benito CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Contracted Services & Suppliers

Description

The Work is located in the City of Hollister and San Benito County. The main project components are: Four (4) Aquifer Storage and Recovery (ASR) wells One disinfection building 12- to 18-inch diameter pipeline with appurtenances (approximately 23,000 linear feet) One flow meter vaul, and one chemical injection vault The project transmission pipeline is within existing public right of way. The well sites, disinfection building, and lateral pipelines (located north and south of Fallon Road) are on private property and utility easements have been purchased by the Owner (San Benito County Water District). CONTRACTOR LICENSE REQUIRED: Class A – General Engineering Contractor

Bonds required. Prevailing wages.

Contact

CBS ID: 764184 | Published 6/5/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.