Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#755136 Posted 4/18/2025

Montecito Drive Transit Access Improvements Project, Chino Hills, CA

Owner Reference
ST23002
Bid Date
May 22, 2025 at 02:00pm
Questions Due By
May 15, 2025 by 2:00pm
Pre-Bid
MANDATORY - 4/29/2025 @ 09:00am @ (for location please or )
Estimate
$330, 000
Owner
City of Chino Hills CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
50 Working Days

Description

The work comprises, but is not limited to: mobilization, traffic control, the removal and reconstruction of deteriorated pavement up to 7”; grind and overlay asphalt pavement up to 2”; striping; adjustment of utility manholes and covers; adjustment of utility valve cans, covers, and hydrant blowoffs; construction of PCC access ramps; storm drain improvements; street light conduits; driveway approaches; sidewalks; fence removal and replacement; retaining curbs and slough walls along Montecito Drive between Los Serranos Boulevard and Lugo Avenue.

Bonds required. Prevailing wages.

Contact

CBS ID: 755136 | Published 4/18/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.