Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#785190 Posted 9/20/2025

NEW BID DATE: Construction of the Interstate 10 Corridor Freight and Express Lane Project - Contract 2A, San Bernardino County, CA

Owner Reference
25-1003269, Fed #6507(055)
Bid Date
Nov 20, 2025 at 02:00pm
Questions Due By
October 1, 2025 by 4:00pm
Owner
San Bernardino County Transportation Authority (SBCTA) CA
DBE Goal
DBE 22%
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
Phase
New Construction, Addition, Expansion

Description

The Interstate 10 Corridor Freight and Express Lane Project – Contract 2A (Project), located in San Bernardino County, proposes to construct a single express lane with price-managed/tolled facilities in both directions of Interstate 10 (I-10) from approximately I-15 to 0.3 miles east of Sierra Avenue, through the cities of Ontario and Fontana (including unincorporated area), and the unincorporated community of Bloomington. The Project improvements consist of inside and outside roadway and bridge structures widening within the project limits and will require improvements to local access ramps, freeway system connectors, and bridge structures. These improvements generally include: Addition of one Express Lane in each direction between the I-10/I-15 Interchange and Sierra Avenue. Provide five Ingress/Egress (I/E) at-grade access locations to the express lanes: three in the westbound direction and two in the eastbound direction. Two intermediate access locations in each direction are combined I/E. One intermediate access location will provide ingress only in the westbound direction to the east of I-15. Additionally, the existing westbound ingress and eastbound egress locations at Haven Avenue in SBCTA’s existing I-10 Express Lane facility will be modified to provide combined I/E access in the eastbound direction only. Relocate five existing Toll Rate Dynamic Message Signs, and associated sign structures and tolling equipment from existing toll equipment pads. Coordinate with SBCTA's Toll Service Provider (TSP) for tolling equipment, maintaining operations, and access to existing toll lanes throughout construction. Separation of general purpose (GP) lanes from the proposed express lanes with a 2-foot wide buffer and surface mounted channelizers within the project limits. Improve existing auxiliary lanes within the project limits. Extend the existing acceleration and deceleration lanes in the eastbound direction between Cherry Avenue and Citrus Avenue.

Bonds required. Prevailing wages.

Contact

CBS ID: 785190 | Published 9/20/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.