This posting has been archived
#596052
•
Posted 8/2/2021
ADP Airside Improvements, San Diego, CA
- Owner Reference
- 412281FC
- Bid Date
- Aug 25, 2021 at 02:00pm
- Pre-Bid
- Scheduled - 7/22/2021 @ 02:00PM @ (for location please or )
- Estimate
- $270,000,000.00
- Owner
- San Diego County Regional Airport Authority
Description
The work for ADP Airside Improvements, project 411001, includes but is not limited to the following: 1. Construction of proposed Terminal 1 apron; 2. Construction of Taxiway A; 3. Construction of East Remain Overnight (RON) parking apron; 4. Shift and reconstruction of Taxiway B from existing Taxiway B4 to Existing Taxiway B6 to 400’
offset from runway; 5. Shift of Taxiway B from Taxiway B6 to Taxiway B10 to 400’ offset from runway; 6. Major items of work will include pavement demolition, utility demolition, grading and earthwork
mass balancing, pavement base courses, concrete paving, asphalt paving, pavement marking, perimeter fencing and wall, jet blast fencing, storm drainage infrastructure, stormwater storage and reuse facilities, airfield lighting and signage, high mast lighting, utility infrastructure, and 12 kV power. Questions are due via email to Missy McGrath & Larry Rodriguez ([email protected].). Bonds required. Prevailing wages apply. DBE requirements.
Contact
- Missy Mcgrath
- (619) 400-2606
- (619) 400-2596
- [email protected]
CBS ID: 596052 | Published 8/2/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.