This posting has been archived
Curtain Wall Repairs & Backfilling at B Street Pier, San Diego, CA
- Owner Reference
- 2020-25
- Bid Date
- Jan 12, 2022 at 10:00AM
- Pre-Bid
- Scheduled - 12/6/2021 @ 10:00am @ (for location please or )
- Estimate
- $10,633,000.00
- Owner
- Port of San Diego CA
- Trades
- General Engineering Contractor GEC
Description
A Curtain Wall Repairs and Stormwater Improvements at B Street Pier. 1. The Curtain Wall Repairs and Stormwater Improvements at B Street Pier project is a structural rehabilitation and stormwater infrastructure upgrade for the Port of San Diego’s B Street Pier. The project consists of two (2) phases; Phase 1: Curtain Wall Repairs and Backfilling at B Street Pier and Phase 2: Stormwater Infrastructure Improvements at B Street Pier that will be constructed in sequence under individual contracts for each phase. a. The Phase 1 Curtain Wall Repairs and Backfilling contract work will upgrade the mole pier’s structural and seismic capacity with new sheet pile and pavement, modify soil characteristics using Deep Soil Mixing (DSM) techniques and replace select portions of existing utilities as well as produce updated utility bulkhead crossings including the pier’s drainage system outfalls. b. The Phase 2 Stormwater Infrastructure Improvements contract work will introduce permanent Best Management Practices (BMPs) to the B Street Pier drainage system to improve water quality of storm water runoff from B Street Pier into the San Diego Bay. Improvements will be in conformance with the Port’s BMP Design manual and will consist of runoff intercepting structural treatment devices and supporting drainage system modifications intended to capture and treat within a tributary range of 9% to 60% of the pier’s surface area. 2. It is anticipated the awarded Phase 1 Curtain Wall Repairs and Backfilling at B Street contractor will be prepared to incorporate District initiated modifications to contract work in support of the Phase 2 Stormwater Infrastructure Improvements project that will follow completion of Phase 1. Project duration is 440 calendar days. Questions are due no later than 10:00 AM on Dec 14th.
Bonds required. Prevailing wages.
Contact
- Ryan L Harris
- (619) 725-6071
- [email protected]
CBS ID: 610087 | Published 12/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.