This posting has been archived
CT 12-0J34U4 Routes 5 & 55 Bridge Construction, RW, SW, JPCP, HMA, Drainage & Electrical System, Irvine, Santa Ana, and Tustin, CA
- Owner Reference
- 12-0J34U4 / ACNH-X059(084)E
- Bid Date
- Feb 10, 2022 at 02:00pm
- Estimate
- $200,000,000
- Owner
- Caltrans Headquarters, Sacramento, CA
- Trades
- General Engineering Contractor GEC, Earthwork and Paving Contractor - General Engineering Contractor, Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs & Gutters, Driveway & Handicap ADA Ramps NIGP 913-47
Description
All labor, tools, equipment, and expenses to construct bridges, RW, SW, JPCP, HMA pavement, Drainage and electric systems on Route 5 in Irvine, Santa Ana, and Tustin at the Newport Avenue Undercrossing and on Route 55 from 0.4 mile North of the Route 55 / 405 Separation to 0.1 mile south of the Route 5 / 55 Separation. Term is 1130 working days. DBE is 24%. Federal Funds. Davis-Bacon Wages. Buy America Clause.
Bonds required. Prevailing wages.
Contact
- Construction Department
- (916) 227-9179
- [email protected]
CBS ID: 610126 | Published 12/6/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.