Pure Water Program, Morena Conveyance South & Middle & Morena Conveyance Bike Lanes, San Diego, CA
- Owner Reference
- K-22-1797-DBB-3-A
- Bid Date
- Mar 17, 2022 at 02:00PM
- Pre-Bid
- Mandatory - 1/6/2022 @ 01:00PM @ (for location please or )
- Estimate
- $116,300,000.00
- Owner
- City of San Diego CA
- Trades
- A - General Engineering Contractor GEC
Description
Contractor must be prequalified. See attached for details. Morena Conveyance South: The Morena Conveyance South project includes the installation of 48” wastewater forcemain pipeline (approx. 17,404 LF) and 30-inch Welded Steel Pipe brine centrate / conveyance pipeline (approx. 17,840 LF) from the Morena Pump Station located at the corner of Sherman and Custer Sts east along Sherman St, north along Morena Blvd, east on Milton St, North on Chicago St, east on Jellett St, north on Denver St and east on Clairemont Dr. until Iroquois Ave, and associated appurtenances. Morena Pipelines: The Morena Pipelines project includes the removal and replacement of 16” cast iron water distribution main with polyvinyl chloride (PVC) (approx. 14,686 LF) and the installation of a 36” Welded Steel Pipe water transmission main (approx. 18,308 LF) and associated appurtenances. The Morena Pipelines move north along Morena Boulevard and Old Morena Blvd from Napa St to Balboa Ave. Phase 1 North City Pure Water Project, Morena Conveyance (BL): This project will install Class II (bike lanes) with buffer, bicycle loops, Sharrows and signage as per plan on the following roadway: Clairemont Dr between Iroquois Ave and Denver St and Morena Blvd between Balboa Ave and Napa Street. Project duration is 730 Working Days. Questions received less than 14 days prior to the date for opening of Bids may not be
considered. MBE, WBE Goals apply based on California State Water Resources Control Board requirements. GFE Documentation required.
Bonds required. Prevailing wages.
Contact
- Stephen Samara
- (619) 533-3619
- [email protected]
CBS ID: 612717 | Published 4/15/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.