Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#630110 Posted 5/26/2022

Gordon Hill Road Pipeline Replacement Project, Escondido CA

Owner Reference
01-06-78-51412
Bid Date
Jul 26, 2022 at 02:00pm
Pre-Bid
Mandatory - 6/1/2022 @ 01:00PM @ (for location please or )
Estimate
$2,600,000
Owner
Valley Center Municipal Water District (VCMWD) CA
Trades
A - General Engineering Contractor GEC, C34 - Pipeline Contractor: Wastewater, Water Mains & Sewer Systems, may include Video Camera Inspections

Description

The project generally consists of abandonment of existing 10-/12-inch buried steel potable waterline, water services and appurtenances on improved Gordon Hill Road (Private) and fenced back yards. Approximately 4,700 linear feet of 12-inch diameter buried polyvinyl chloride (PVC) potable waterline including valves, water services, appurtenances shall be installed within Gordon Hill Road (Private) and VCMWD Easements, between Old Castle Road (Public) and Welk View Drive (Private). Segments of existing pipeline in conflict with proposed waterline alignments shall be removed and disposed. Tie in connections are required within Old Castle Road, an existing developed County of San Diego public road and Welk View Drive (Private). 365 calendar days duration. This project funded through the State Water Resources Control Board and DBE participation requirements apply.

Bonds required. Prevailing wages.

Contact

CBS ID: 630110 | Published 5/26/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.