This posting has been archived
Parker Pump Station Replacement Project, Coronado CA
- Owner Reference
- 19-CO-ES-707
- Bid Date
- Jun 30, 2022 at 02:00pm
- Estimate
- 24,300,000
- Owner
- City of Coronado CA
- Trades
- A - General Engineering Contractor GEC, WWTP Wastewater Treatment Plant Construction & Repair: Tank Power Wash, Pressure Washing - General Engineering Contractor
Description
Bonds required. Prevailing wages.
Contact
- Lucy Gonzalez, c/o Stacy and Witbeck, Inc.
- (562) 355-7543
- [email protected]
CBS ID: 631086 | Published 6/7/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.