Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#653152 Posted 1/7/2023

Bid date change - Murphy Canyon Trunk Sewer Repair / Rehab Phase 1, San Diego, CA

Owner Reference
K-23-2153-DBB-3
Bid Date
Feb 16, 2023 at 02:00pm
Estimate
$4,450,000.00
Owner
City of San Diego CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities, C34 - Pipeline Contractor: Water Mains, Sewer Lines, Wastewater Systems & Related Structures; possible Video Camera Inspections

Description

The Scope of Work consists of Rehabilitation of approximately 19,114 feet (3.62 Miles) of existing 12-inch to 36-inch of vitrified clay pipe (VCP) sewer mains. The project includes rehabilitation of all associated sewer laterals from the sewer main to the property line or lateral connections within private streets and easements, and rehabilitation of 68 manholes. Questions received less than 14 days prior to the date for opening of Bids may not be considered. SLBE Good Faith Effort Documentation required. 1. SLBE participation 8.0% 2. ELBE participation 14.3% 3. Total mandatory participation 22.3%

Bonds required. Prevailing wages.

Contact

CBS ID: 653152 | Published 1/7/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.