Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#677498 Posted 7/19/2023

Treatment Plant Raw Water Large Valve Installation Project, Lakeside CA

Owner Reference
CIP22002K
Bid Date
Aug 22, 2023 at 10:00am
Pre-Bid
Recommended - 7/21/2023 @ 10:00am @ (for location please or )
Estimate
$1,462,000
Owner
Helix Water District (HWD) CA
Trades
A - General Engineering Contractor GEC; Subcontractor Opportunities

Description

The project consists of installation of a 60-inch butterfly valve and valve vault, installation of an access manway, abandonment of an existing 60-inch butterfly valve, and upgrades within an existing valve vault at the R.M. Levy Water Treatment Plant in Lakeside, California. USEPA and WIOFIA funding requires DBE GFE.

Bonds required. Prevailing wages.

Contact

CBS ID: 677498 | Published 7/19/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.