Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#746988 Posted 3/3/2025

NEW BID DATE - MBC Pipe Gallery Replacement, San Diego, CA

Owner Reference
K-25-2380-DBB-3
Bid Date
Apr 16, 2025 at 02:00pm
Pre-Bid
Encouraged - 3/13/2025 @ 10:00am @ (for location please or )
Estimate
$2,180,000
Owner
City of San Diego CA
Trades
Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
232 Working Days

Description

Construction of the MBC Pipe Gallery Replacement project involves the replacement of existing reclaimed water lines. The project consists of removing and replacing approximately 347 LF of existing 3-Inch pipe, 792 LF of existing 4-Inch pipe, 1859 LF of existing 6-Inch pipe, and 1113 LF of existing 8-Inch pipe with new epoxy-lined steel pipes within the pipe gallery, buildings 76, 70, 60 and Grit Room at the Metropolitan Biosolids Center. The project will also replace existing copper tubing with new copper tubing. The pipeline installation will include new pipe hangers, supports, butterfly valves, ball valves, and associated appurtenances. The construction also includes the replacement of two pressure reducing manifold systems in Building 70. Mandatory SLBE participation goal is 8.6% goal, ELBE participation is 13.7% goal. Total Mandatory SLBE-ELBE partifcipation goal is 22.3%

Bonds required. Prevailing wages.

Contact

CBS ID: 746988 | Published 3/3/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.