CBS ID: 746988
San Diego County
Owner Reference: K-25-2380-DBB-3
Bid Date: 04/16/2025 at 02:00pm
Pre-Bid: 03/13/2025 @ 10:00am
Estimate: $2,180,000
Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C34 - Pipeline Contractor: Water Mains, Sewer Mains, Water Lines; CIPP Pipe liners, Pipe Inspection, Video & Robotic Cameras
Construction of the MBC Pipe Gallery Replacement project involves the replacement of existing reclaimed water lines. The project consists of removing and replacing approximately 347 LF of existing 3-Inch pipe, 792 LF of existing 4-Inch pipe, 1859 LF of existing 6-Inch pipe, and 1113 LF of existing 8-Inch pipe with new epoxy-lined steel pipes within the pipe gallery, buildings 76, 70, 60 and Grit Room at the Metropolitan Biosolids Center. The project will also replace existing copper tubing with new copper tubing. The pipeline installation will include new pipe hangers, supports, butterfly valves, ball valves, and associated appurtenances. The construction also includes the replacement of two pressure reducing manifold systems in Building 70. Mandatory SLBE participation goal is 8.6% goal, ELBE participation is 13.7% goal. Total Mandatory SLBE-ELBE partifcipation goal is 22.3% Bonds required. Prevailing wages.
Rosa Riego
Login or create an account
Login or create an account
Owner: City of San Diego CA
Published 03/03/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.