Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#620216 Posted 3/2/2022

Site Improvements Project at McKinley Elementary School, San Francisco, CA

Owner Reference
12285
Bid Date
Mar 31, 2022 at 11:00am
Pre-Bid
Mandatory - 3/10/2022 @ 01:30pm @ (for location please or )
Estimate
$220k
Owner
San Francisco Unified School District (SFUSD) CA
Trades
Site Work, A - General Engineering Contractor GEC, C22 - Asbestos, Lead paint, Other Toxic Material Abatement & Remediation

Description

The project is described as: site improvements to exterior play yard, removal of existing wood retaining wall and its replacement with a new concrete retaining wall with wood siding. This work involves the following; a. Removal and proper disposal of existing lower wood retaining wall and posts b. Removal and replacement of the existing wood posts on the upper wood retaining wall. c. Installation of poured-in-place concrete seat wall with piers to replace lower wood retaining wall. d. Installation of ipe wood siding over the concrete seat wall. e. Abatement of hazardous materials. f. Miscellaneous patch and repair of existing play yard paving. DVBE goal 3%. 

Prevailing wages.

Contact

  • Gioia Suplick
  • (415) 355-6979

CBS ID: 620216 | Published 3/2/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.