Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#660652 Posted 3/2/2023

Balboa High School Viewing Stand Building Repairs – Phase 1, San Francisco, CA

Owner Reference
12269
Bid Date
Mar 22, 2023 at 11:00am
Estimate
$3,000,000
Owner
San Francisco Unified School District (SFUSD) CA
Trades
B - General Building Contractor GBC: Building Construction Services, Subcontractor Opportunities

Description

The Project is generally described as, but not limited to, restoration and repairs of a viewing stand building involving: selective demolition, hazardous materials abatement, concrete pavement, storm drainage systems, concrete rehabilitation, metal fabrications, fluid-applied roofing, sheet metal flashing, joint sealants, wood window rehabilitation, hollow metal doors and frames, FRP doors, door hardware, aluminum windows, glazing, gypsum board assemblies, elastomeric coatings, painting, signs, aluminum bleachers, HVAC, plumbing, fire sprinklers, electrical, lighting, fire alarm devices, athletic rubber surface tiles. DVBE goal is 3%.

Bonds required. Prevailing wages.

Contact

CBS ID: 660652 | Published 3/2/2023 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.