Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#781537 Posted 9/3/2025

SFUSD Administrative Offices (2055 Sunnydale Avenue) - Building Repairs and Maintenance, San Francisco, CA

Owner Reference
12463
Bid Date
Sep 24, 2025 at 11:00am
Pre-Bid
MANDATORY - 9/4/2025 @ 10:00am @ (for location please or )
Estimate
$2,500,000.00
Owner
San Francisco Unified School District (SFUSD) CA
DBE Goal
3%
Trades
Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
Phase
Contracted Services & Suppliers

Description

The Project is generally described as the building exterior and interior repairs including miscellaneous improvements to the spaces currently used by and shared with the Samoan Community Development Center. The work includes, but not necessarily limited to the: 1. Install perimeter fencing with gate at the front courtyard facing the Auditorium. 2. Replace storefront at the main entrance and install exterior cladding with new signage. Paint selected exterior walls. 3. Selective replacement of damaged glazing on all exterior windows. Repairs to the existing main sewer line along Sunnydale Avenue. 5. Replace exterior windows in Cafeteria and Auditorium. 6. Partial removal of stage and enlargement of the main auditorium hall which includes new wood flooring and miscellaneous wall repairs. 7. Repairs and replacement of damaged kitchen exhaust, walk-in refrigerator and miscellaneous mechanical equipment. 8. Install roof coating over the existing roof of the main classroom wing. 9. Additive Alternate No.1, Kalwall panel system in auditorium as generally shown on sheets A2.11 and A2.21. 10. Additive Alternate No. 2, Roof resurfacing restoration system over the Kitchen / Cafeteria Areas as generally shown on sheets A2.45 and A2.47. 11. Additive Alternate No. 3, Roof resurfacing restoration system over the Auditorium Area as generally shown on sheets A2.45 and A2.47. 12. Additive Alternate No. 4, Roof restoration system over the Main Entrance and Administration Offices as generally shown on sheets A2.45 and A2.47. 13. Additive Alternate No. 5, New flooring in the Administration Offices and Corridor as generally shown on sheet A2.21. 14. Additive Alternate No. 6, New lighting on the first and second floor corridors as shown on sheets A2.21, E2.41, and E2.42. 15. Perform hazardous materials and lead paint abatement as described and specified in Specification Section 00 31 26 and Appendix A. Class B, General Building Contractor with Asbestos and Lead Certification or Sub-Contractor with Asbestos and Lead Certification performing the work. The District has a Disabled Veteran Business Enterprise (“DVBE”) Participation Goal Program (“the DVBE Program”) which establishes a three percent (3%) Participation Goal for DVBEs. A

Bonds required. Prevailing wages.

Contact

CBS ID: 781537 | Published 9/3/2025 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.