This posting has been archived
2022 Paving Project - Phase III (Bear Creek HS & Delta Sierra MS), Stockton CA
- Owner Reference
- 0949-8249 & 0941-8241
- Bid Date
- Feb 24, 2022 at 02:00pm
- Pre-Bid
- Mandatory - 2/3/2022 @ 03:00PM @ (for location please or )
- Owner
- City of Lodi Unified School District CA
- Trades
- A - General Engineering Contractor GEC, B - General Contractor GC
Description
Removal and replacement of existing AC Paving, aggregate base material, and
miscellaneous concrete sidewalks, and curb and gutter at the existing parking lots.
Install new AC Paving, aggregate base material, new sidewalks and curb and
gutters at new additional parking lot areas, additional parking lot lighting at Bear
Creek HS and trash enclosure at Delta Sierra MS.
Bonds required. Prevailing wages.
Contact
- 209.331.7219
- 209.331.7229
CBS ID: 616242 | Published 1/30/2022 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.