Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#641148 Posted 9/19/2022

Bid date change - Thornton Wastewater Improvement Project, Stockton CA

Owner Reference
2122-008
Bid Date
Nov 16, 2022 at 01:00pm
Pre-Bid
Recommended - 10/11/2022 @ 09:00am @ (for location please or )
Owner
Housing Authority County of San Joaquin (HACSJ) CA
Trades
A - General Engineering Contractor GEC

Description

The Project consists of the Thornton Pump Station, Flow Control Facility, closure/demolition of the existing Thornton Wastewater Treatment Facilities and construction of approximately 11,000 feet of 8-inch sanitary sewer force main and 2,000 feet of 15-inch gravity sewer with manholes connecting the Thornton Pump Station to SASD Pump Station S0147. HUD DBE and Section 3 participation requirements.

Bonds required. Prevailing wages.

Contact

CBS ID: 641148 | Published 9/19/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.