Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#723130 Posted 9/20/2024

Main Street (Northgate Drive to Alameda Street) Bike and Pedestrian Improvement Project, Manteca CA

Owner Reference
CIP 20005 FED: HSIPL 5242(035)
Bid Date
Oct 10, 2024 at 02:00pm
Questions Due By
10/3/24 by 5 pm
Pre-Bid
Mandatory - 10/2/2024 @ 10:00am @ (for location please or )
Owner
City of Manteca CA
Trades
Class A - *General Engineering Contractor GEC; Subcontractor Opportunities
Phase
Renovation, Remodel, Improvements, Upgrades
Duration
final completion 130 working days

Description

Furnishing all labor, materials, and equipment, and performing all work necessary and incidental to the construction of the project known as the Main Street Bike and Pedestrian Improvements Project CIP 20005 HSIPL 5242(035) according to the plans and specifications as prepared by the City of Manteca and according to the Contract Documents. The work includes the installation of bike lanes, raised medians with pedestrian median fencing, enhanced pedestrian crossings, pedestrian hybrid signal installation, traffic signal detector loops modification, and slurry sealalong Main Street from Northgate Drive to Alameda Street. Federally funded. DBE partyicipation goal is 21%

Bonds required. Prevailing wages.

Contact

CBS ID: 723130 | Published 9/20/2024 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.