Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#617044 Posted 2/5/2022

Hillside Boulevard Road Diet Improvements Project, South San Francisco CA

Owner Reference
TR1906
Bid Date
Mar 8, 2022 at 02:00pm
Owner
City of South San Francisco CA
Trades
A - General Engineering Contractor GEC

Description

The work generally consists of items listed below and is located along Hillside Boulevard from Lincoln Street to Lawndale Boulevard, South San Francisco, CA. A detailed scope of work is included in the bid documents. • Install project signs; • Provide notification and postings required by the special provisions and specifications; • Provide traffic control throughout the duration of the project per the approved traffic control plan; • Prepare Water Pollution Control Program and submit to the City for review for approval as part of the project submittal; • Comply with the Construction Waste Management Plan (WMP) ordinance reporting requirements of the City (See appendix page for the procedures and forms);Conform with existing asphalt concrete; • Construct full depth hot mix asphalt pavement at locations designated on the plans; • Sawcut existing asphalt concrete and remove existing pavement section;  • Remove existing sidewalk, curb and gutter and off-haul and dispose of all concrete material;  • Install new curb ramps;  • Install drainage components and trench drains  • Construct new sidewalks, curb ramps with truncated domes, and curb and gutter;  • Install a new traffic signal at the Hillside Boulevard and Lincoln Street intersection; Adjust vehicle detection at the Hillside Boulevard at Lawndale Boulevard, Hillside Boulevard at Chestnut Avenue and Hillside Boulevard at Stonegate Drive intersections; install cellular communication devices and reconnect existing signal interconnect cable;  • Remove existing striping and markings and install new pavement striping, markings and markers;  • Apply slurry seal along the full width of pavement for entire project limit  • Replace existing chain link and wood fence  • Demobilize and complete Final clean-up

Bonds required. Prevailing wages.

Contact

CBS ID: 617044 | Published 2/5/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.