#825248

1475 Rosita Road Slope and Sharp Park Road V-Ditch Stabilization Projects, Pacifica, CA

The 1475 Rosita Road Slope Stabilization project consists of removing the landslide debris on the slope between the top of the existing gunite creek bank wall and the backyard at 1475 Rosita Road and replacing it with a geogrid reinforced 1.5:1 engineered compacted fill slope equipped with a subdrain and other miscellaneous related work (BASE BID). The Sharp Park Road Stabilization Project consists of removing approximately 50 feet of undermined concrete lined V-ditch and replacing it with a new 50-foot section of concrete retaining wall/V-ditch. The new retaining wall/V-ditch is designed resist undermining, and lateral pressures, and be doweled into the existing V-ditch at both ends and other miscellaneous related work

Post Date: 05/21/2026 Bid Date: 06/11/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, D63 - Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#829099

FY2026-2029 Creek & Channel Cleaning Project, Burlingame, CA

The project consists of cleaning designated creeks and channels in the City of Burlingame. Work includes, but is not limited to, sediment, vegetation, and debris removal, hauling and disposal. The contractor is to become fully familiar with all instructions, provisions, conditions and specifications contained in the bid documents

Post Date: 06/16/2026 Bid Date: 06/16/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, D63 - Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling
#828146

2026 Microsurfacing Project (Various Streets), Redwood City, CA

The base work of this project consists generally of, without limitation, notification of residents; traffic control; installation of best management practices for storm water management; roadway grinding and paving; removal of existing sidewalk, curb & gutter, and curb ramps and replacement with new curb ramps and sidewalks; asphalt concrete spot reconstruction/dig outs; resurfacing City streets with Microsurfacing; adjustment of utility lids to the new grade; removal of sign posts and signs & installation of new sign posts and signs; installation of new roadway markings and striping; installation of Rectangular Rapid Flashing Beacons (RRFB), and site cleanup. A Bid Alt Construction element in the Downtown - Broadway Ped Mall includes similar work. Contract Documents fully describe the Work

Post Date: 06/09/2026 Bid Date: 06/17/2026 Trades: C12 - Earthwork & Paving Contractor: Pavement Preservation, Resurface, Slurry Seal, High Friction, Milling, Land Clearing, Trails/Path, Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete, C45 - Signs & Signage Contractor: (Non-Electrical & Electrical) Digital & Video Displays, Tower Clocks, Billboards, Scoreboards, Wayfi, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
#828804

SOURCES SOUGHT SLAC Sector 30 Erosion Mitigation Project, Menlo Park, CA

SLAC is seeking a qualified general contractor to perform construction work to mitigate soil erosion in an area referred to as Sector 30.This project aims to remove and replace the current failed pavement, slope, earthwork, and storm drain and install permanent vegetation and erosion control measures.

Post Date: 06/12/2026 Bid Date: 06/18/2026 Trades: Class B - *General Building Contractor GBC: Building Construction, Enclosed Structures; Opportunities for Subcontractors
#826939

2026 Crack Seal and Slurry Seal Project, Atherton, CA

Performing crack sealing and Type II micro-surfacing per Town specifications on the listed streets, which includes notifications, traffic control, prep work, micro-surface seal installation, compaction, sweeping, and re-striping/pavement markings (as needed) with a 1-year guarantee

Post Date: 06/02/2026 Bid Date: 06/25/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C31 - Construction Zone Traffic Control Contractor, Flashing Beacons, Pavement Marking, Traffic Striping, Raised Pavement Markers (RPMs) & Reflectors, Centerline Rumble Strips
#826941

2026 Spring Patch and Street Overlay Project, Atherton, CA

The project scope consists of pavement repairs, rehabilitation, and overlays, including: 1.1 Grinding and replacing approximately 32,000 square feet of asphalt to a six-inch depth on various streets. This work includes all necessary traffic control, grinding, sweeping, tack coating, replacing asphalt to appropriate depth in an appropriate number of lifts, and finishing rolling per Town of Atherton Standard specifications and special provisions. Some hand work around utility manhole covers will be required. 1.2 1.3 1.4 Grinding and replacing of approximately 90,000 square feet of asphalt for 2 inches of asphalt concrete pavement on Various Streets. Once the roadway is grinded down, the contractor and the Towns project engineer shall identify any pavement failures for repairs. Grind and replace (digouts) asphalt to a 6-inch depth from the milled surface: then contractor shall perform crack sealing (per specification). Some hand work around utility manhole covers will be necessary. Repave the entire street with a self-propelled paver & finish per Town Standard Specifications. Replacement and installation of traffic striping, pavement markings, and markers. Construct two raised crosswalks along Selby Lane along with 6 thermoplastic white fog lines along the length of Selby Lane as shown on the plans per the Town Standard Specifications

Post Date: 06/02/2026 Bid Date: 06/25/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, C31 - Construction Zone Traffic Control Contractor, Flashing Beacons, C8 - Concrete Contractor: Pavement, Driveways, Sidewalks, Curbs, Gutters, Flatwork, ADA Ramps Pedestrian Improvements, CIP Concrete
#825603

Golden Gate Shrine, San Bruno, CA

Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside, 238910 - Site Preparation Contractors. The construction contractor shall provide all labor, management, materials, tools, equipment, and services necessary to construct project.

Post Date: 05/23/2026 Bid Date: 06/26/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
#829098

FY2026-2027 Park Road Pits Debris & Sediment Removal Project, Burlingame, CA

The City is soliciting bids for the FY2026-2027 PARK ROAD PITS DEBRIS & SEDIMENT REMOVAL PROJECT. The project consists of removing debris and sediment from the underground sediment collection bays located Park Road in the City of Burlingame. Work includes, but is not limited to, sediment, vegetation, and debris removal, hauling, and disposal. The City of Burlingame will be receiving bids for this project via PB SystemTM, a fully automated web-based vendor and bid management system. Prospective bidders should visit https://pbsystem.planetbids.com/portal/46106/portal-home to register, download bid documents and submit their bid. All bids must be submitted to PB System by 2:00 pm on Monday, June 29, 2026. Bid results will be available at that time and viewable via PB System

Post Date: 06/16/2026 Bid Date: 06/29/2026 Trades: Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors, D63 - Cleanup Contractor: Debris Removal, Obstruction Hauling, Building/Grounds/Structures/Water - Demolition & Hauling