This posting has been archived
#592045
•
Posted 6/26/2021
Potential Subcontracting Lead - Rehabilitate Parallel & Connecting Taxiways, Phase 1, Santa Maria, CA
- Bid Date
- Jul 6, 2021 at 02:00pm
- Pre-Bid
- Mandatory - 6/24/2021 @ 10:00am @ (for location please or )
- Estimate
- $9,500,000
- Owner
- Santa Maria Public Airport
Description
The work comprises of the following: • Site preparation including clearing, grubbing, demolition and removals. • In-place grind of existing structural section, temporary stockpile, place back into section. • Earthwork and subgrade preparation. • Construct new structural section including recycled material, aggregate base and asphalt pavement. • Trenching, backfill, and compaction. Installation of airfield electrical systems including conduit, conductor, edge lights and guidance signs. • Airfield pavement marking.
• Construction site environmental control including storm water management. • Hydro-mulch erosion control. Bonds required. Prevailing wages apply. M/WBE Goals: 26.6%. Buy American preference.
Contact
- 805.922.1726
- 805.922.0677
CBS ID: 592045 | Published 6/26/2021 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.