Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#644243 Posted 10/18/2022

CT 05-1C3604 Route 217 Bridge Replacement, Goleta, CA

Owner Reference
05-1C3604 / ACNH-P217(003)E
Bid Date
Dec 7, 2022 at 02:00pm
Estimate
$24,100,000
Owner
Caltrans Headquarters Sacramento (CADOT) CA
Trades
A - General Engineering Contractor GEC, C8 - Concrete Contractor: Pedestrian Improvements, Repairs, Sidewalks, Curbs, Driveways & Handicap ADA Ramps NIGP 913-47, C12 - Earthwork and Paving Contractor - General Engineering Contractor, D9 - Drilling & Blasting, Oil Field Work, C61 - Limited or Specialty Contractor

Description

All labor, tools, equipment, and expenses to provide bridge replacement services on Route 217 near Goleta from 0.2 mile East of Goleta Slough Bridge to 0.4 mile East of San Jose Creek Bridge. Term is 800 working days. DBE 20%

Bonds required. Prevailing wages.

Contact

CBS ID: 644243 | Published 10/18/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.