This posting has been archived
Carpinteria Advanced Purification Project (CAPP) Conveyance, Carpinteria CA
- Owner Reference
- 0965-25-1004-1005 or SCH# 2019011016
- Bid Date
- Dec 9, 2025 at 10:00am
- Pre-Bid
- MANDATORY - 11/14/2025 @ 10:00am @ (for location please or )
- Owner
- Carpinteria Valley Water District CA
- Trades
- Class A - *General Engineering Contractor GEC: Heavy & Civil Engineering Construction, Infrastructure; Opportunities for Subcontractors
- Phase
- Renovation, Remodel, Improvements, Upgrades
Description
The Project includes the following Work: • Construction of approximately 4,700 10-inch and 805-ft 8-inch PVC purified water pipeline from the Carpinteria Advanced Purification Project’s (CAPP) Advanced Water Purification Facility (AWPF) to injection wells located on Linden Ave and Meadow View Lane, valves, blowoffs, combination air valves, and other pipeline appurtenances. • Construction of approximately 815-ft of 12-inch PVC backwash pipeline from the Linden Injection Well site to the Meadow View Injection Well site. • Construction of gravity backwash pipeline system, including approximately 290-ft of 8”, 330-ft of 24”, and 250-ft of 12” gravity pipelines, junction structures, and a connection to the existing sanitary collection system. • Construction of 810-ft of electrical duct bank from the Linden Injection Well site to the Meadow View Injection Well site.
Bonds required. Prevailing wages.
Contact
- Chris Malejan
- [email protected]
CBS ID: 793976 | Published 11/5/2025 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.