Sign in to your account

Need an account?

Reset your password

Remembered your password?

Create your account

Already have an account?

This posting has been archived

#632290 Posted 6/20/2022

Chaboya Improvements, San Jose CA

Owner Reference
C21011
Bid Date
Jun 29, 2022 at 10:00am
Owner
Santa Clara Valley Transportation Authority (SCVTA) CA
Trades
Subcontractors, A - General Engineering Contractor GEC, B - General Contractor GC

Description

RFQ bid was approved back on April 29, 2022. Now seeking DBE/DVBE/MBE/WBE/SBE subcontractors - All trades associated with Site Improvements and Building Renovation and remodeling. Site Improvements - Alterations to the staff parking area, various utility alterations and additions, fencing alterations, and new stormwater control features with associated landscaping. Building A - Offices: Base Bid: Fire alarm replacement throughout building. Bid Alternate: Interior remodeling of dispatch office and two storerooms, and associated work in breakroom and to the building path of travel. Interior finishing and related construction including interior partitions and doors; new fire-protection elements, plumbing, HVAC, and electrical work. Building B - Maintenance Training: Fire alarm replacement. Building C - Repair Shops: Demolition of existing canopy. Addition of 1-story area for two repair bays for articulated buses. Interior remodeling of shop and storage areas. New steel framing system with shallow foundations; CMU base wall with ribbed metal siding exterior with steel framing backup, unit skylights, and ribbed metal roof; industrial equipment; and plumbing, HVAC, and electrical work. Interior finishing and related construction including interior partitions and doors; fire suppression elements and interconnection to existing system, and plumbing, HVAC, and electrical work. Fire alarm replacement. Building D - Vault: Fire alarm replacement. Building E1 - Fuel Island: Fire alarm replacement. Building E2 - Tire Shop: 1-story canopy with enclosed area for new tire shop storage added to existing 1-story bus wash canopy. New steel framing system on shallow foundations; CMU base wall with ribbed metal siding exterior with steel framing backup, unit skylights, and ribbed metal roof; industrial equipment, and plumbing, HV AC, and electrical work. Installation of salvaged furnishings, fixtures, and equipment as indicated. Building F - Steam Clean Bay: New lift, supporting concrete slab; and associated plumbing and electrical work. Interior cleaning as needed to facilitate new work. Remove & Replace complete Fire Alarm System in Buildings A, B, C, D & E1. The Engineer’s Estimate for this Work ranges from $6.2 million to $7.0 million. The time limit for completion of all Work is 550 calendar days. The Bidder to whom the Contract will be awarded (“Contractor”) must, at the time of Bid Opening, possess current licenses in the following classifications issued by the California Department of Consumer Affairs, Contractors State License Board: Class A (General Engineering Contractor) or Class B (General Building Contractor) or any licenses below C2, C4, C56, C6, C7,C8, C9, C10, C12, C13, C15, C16, C17, C20, C21, C27, C28, C32, C33, C34, C36, C39, C41, C43, C45, C50, or C60

Contact

CBS ID: 632290 | Published 6/20/2022 on Construction Bid Source

DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.