This posting has been archived
#727214
•
Posted 10/20/2024
US 101 – SR 85 Express Lane (Phase 4), Santa Clara, CA
- Owner Reference
- C24123F
- Bid Date
- Dec 11, 2024 at 02:00pm
- Questions Due By
- December 4, 2024, 2:00pm
- Pre-Bid
- Scheduled - 11/13/2024 @ 10:00am @ (for location please or )
- Owner
- Santa Clara Valley Transportation Authority (SCVTA) CA
- Trades
- Class A - *General Engineering Contractor GEC: Engineering & Infrastructure Building; Opportunities for Subcontractors , C32 - Road Improvements: Pavement Resurface Seal Coat for Highway Roads Bridge Dam Overpass, Runways - NAICS 237310
- Phase
- Contracted Services & Suppliers
Description
The Work to be performed under the Contract consists of furnishing all labor, materials, tools, equipment, services, supervision, and incidentals necessary to convert the existing High Occupancy Vehicle (HOV) lanes to Express Lanes (previously known as High Occupancy Toll (HOT) lanes) along US 101 from near Metcalf Road to the US 101/SR 85 Separation, and along SR 85 from the US 101/SR 85 Separation to Almaden Expressway Undercrossing in San Jose. The project limits are approximately 2 miles within a portion of US 101 and 6 miles within a portion of SR 85., as further described in the scope in the Technical Specifications.
Contact
- Navdeep Kaur
- [email protected]
CBS ID: 727214 | Published 10/20/2024 on Construction Bid Source
DISCLAIMER: The bid notifications listed on Construction Bid Source are compiled from various sources and updated daily. It is the responsibility of each user, whether browsing publicly or logged in, to contact the project owner directly for the purpose of bidding and obtaining additional project details. Construction Bid Source does not assume any responsibility for omissions or errors in the information provided.